107,preparation before construction of large atmospheric storage tank (3) - doer equipment

classification:industry publishtime:2019-11-07 13:46:10

preparation before construction of large atmospheric storage tank (3)


preparation before installation


clean up the construction site, make rational use of the construction site, and arrange it reasonably and compactly. all kinds of machines and tools are best placed under the tank foundation, and valves, pipe fittings, installation tools and other small things are also placed under the tank foundation or in the nearby dry and ventilated storage room.


the assembly floor should be flat and large.


1) the area of the second block is about 30m × 30 m level ground as prefabrication yard.


2) equipped with corresponding machines and tools.


3) unpacking and counting.


the basis of unpacking and counting is the delivery list and packing list prepared by the equipment supplier (personnel of both parties are required to participate in the counting: the equipment supplier is the construction unit and the construction unit).


i hope the above requirements can help you. every project is the result of your hard work. let's do it with 12 points. the earnest implementation of every process is our greatest responsibility for the project!