hotline
86 512-81666096-
105,preparation before construction of large atmospheric storage tank (1) - doer equipment…
preparation before construction of large atmospheric storage tankfor large atmospheric storage tank site construction project, the preparation before construction is essential. it i…
[2019.11.07] -
104,ltd liquid level temperature density detection anti rollover system, lng storage tank …
ltd liquid level temperature density detection anti rollover system, lng storage tank (1)instrument installation of lng storage tank
[2019.11.06] -
103,ltd liquid level temperature density detection anti roll system, lng storage tank (1) …
ltd liquid level temperature density detection anti roll system, lng storage tankthe liquid level temperature density meter is equipped with a vibrating density probe, a rtd tempera…
[2019.11.06] -
102,about tank fire (detection) alarm system (2) - doer equipment
about tank fire (detection) alarm system (2)lifting device of in tank pump
[2019.11.05] -
101,on tank fire (detection) alarm system (1) - doer equipment
about tank fire (detection) alarm systemfor the tank fire detection and alarm system, according to the code for construction and acceptance of automatic fire alarm system (gb 50166-…
[2019.11.05] -
100,scheme of tank fire safety system (2) - doer equipment
scheme of tank fire safety system (2)spray cooling device:
[2019.11.04] -
99,scheme of tank fire safety system (1) - doer equipment
scheme of tank fire safety systemdry powder fire extinguishing device
[2019.11.04] -
98,description of lng i & c system (2) - doer equipment
description of lng instrument control system1) distributed control system (dcs)
[2019.11.01] -
97, scheme of instrument control system for full tank (1) - doer equipment
scheme of instrument control system for full tankdesign principle of instrument control system for full tank
[2019.11.01] -
96,about tank interlayer and inner tank purging pipeline - doer equipment
about tank interlayer and inner tank purging pipelinethe nitrogen seal pipeline connecting with the nitrogen source of the system shall be reserved in the storage tank. before the t…
[2019.10.31] -
95,on tank discharge and return system - doer equipment
on the tank discharge and return system◆ liquid out of storage tank (loading): each storage tank is equipped with 2 submerged pumps (single flow: ~ 450m) ³/ h. lift: 140m.), the d…
[2019.10.31] -
94,overview of lng tank system technology - doer equipment
overview of lng storage tank system processliquefied natural gas from lng liquefaction unit and lng unloading platform is sent to lng full capacity tank for storage through low temp…
[2019.10.30] -
93,on the performance of thermal insulation system and cold insulation material of storage…
on the thermal insulation system of storage tank and the performance of cold insulation materialsanchor devices are evenly set around the lower part of the main container and the se…
[2019.10.30] -
92,how to choose the main equipment material of full tank - doer equipment
how to select the main equipment material of full tankselection of main vessel, secondary vessel and hot angle protection materials
[2019.10.29] -
91, introduction to the tank - doer equipment
introduction to the storage tank ◇ the connecting pipe in the tank is mainly low-temperature pipe, and the sleeve is set at the connection between the low-temperature pipe and the…
[2019.10.29] -
90,on the inner and outer tank anchoring device of storage tank - doer equipment
on anchoring device of inner and outer tanks◇ the anchoring device is evenly set around the lower part of the main container and the secondary container of the storage tank, and it…
[2019.10.28] -
89,design of bottom interlayer and top insulation of atmospheric storage tank - doer equip…
design of bottom interlayer and top insulation layer of atmospheric storage tank ◇ about the insulating layer at the bottom of the atmospheric storage tank: laying common strength …
[2019.10.28] -
88,doer company's instructions for equipment design change and material substitution -…
dur's explanation of equipment design change and material substitution★ design change refers to the notice of design change issued by the design unit or on-site design representati…
[2019.10.26] -
87,introduction to management responsibilities of construction staff at doer site - doer …
introduction to management responsibilities of construction staff in doer site★ project manager
[2019.10.26] -
86,measures to prevent water pollution in gasifier construction site - doer equipment
water pollution prevention measures of gasifier construction site● a sedimentation tank is set at the mixer front desk and the cleaning place of transport vehicles at the gasifier …
[2019.10.25]