16、doer civilized construction management standard - doer equipment
classification:enterprise news publishtime:2020-12-21 14:03:13
doer civilized construction management standard
the construction organization design shall be conscientiously implemented, the temporary construction management and general layout control shall be well done, and the water and electricity management of roads and construction shall be strengthened to ensure the safety, standardization, tidiness and sanitation of the construction site environment.
strengthen the command and control of the project department, organize the construction in strict accordance with the construction organization design and construction technical scheme, implement the construction procedure and network plan, and do a good job in the cross and connection of processes and the coordination of labor, machines, materials and other production factors.
all regulations in the company's safety and environment manual and procedure document of safety and environment system shall be implemented.
the equipment and materials must be placed according to the regulations when entering the site, so that the upper cover and the lower cushion and the label are accurate. special materials and equipment shall be protected from damage, moisture and corrosion, and materials of special materials shall be clearly marked.
large machines and tools, transport vehicles, etc. shall be stored in designated places, small machines and tools, "four steel cylinders", etc. shall be properly kept and placed in order, construction surplus and waste materials shall be classified and stored in an orderly manner, industrial waste shall be cleaned up in time, and the construction site shall be kept clean after construction.
the site safety and fire-fighting facilities are complete and the safety signs are eye-catching. the construction personnel shall conscientiously implement various safety management systems and fire prevention regulations to ensure the construction safety.
after the completion of the project, all kinds of temporary facilities on the construction site should be removed and removed in time, and the site should be cleaned up to achieve the completion of the project with high standards.
we should conscientiously fulfill our contractual obligations and develop the construction period, quality and service simultaneously. under the unified leadership of the construction unit, organize forces to actively do a good job in the tracking and operation of the test run and the aftercare service, so as to escort the safe, stable, long-term, full and excellent operation of the device.
prev: 15、10000m ³ liquid nitrogen storage tank, 8000m ³ liquid oxygen storage tank falling into doer
next: 18、doer equipment, i wish you a happy mid autumn festival! family reunion!
news
- 205、lng operating procedures - doer equipment [2022-11-15]
- 205. tank classification and characteristics - doer… [2022-11-15]
- 204. brief introduction to tank development - doer … [2022-10-31]
- 204、lng vacuum cryogenic liquid storage tank - doe… [2022-10-31]
- 203、precautions for precooling of natural gas stor… [2022-10-28]
- 203、preparation before pressure regulation of lng … [2022-10-24]
- 3,successful test run of cangzhou ethylene storage… [2019-09-02]
- 2,advantages of suzhou doer large cryogenic tank … [2019-08-30]
- 1,congratulations on the success of one-time liqui… [2019-08-26]